BAYBURT ENERGY


Our company established on January 11, 2005 within the group companies as a result of evaluation of international and regional efforts to meet the increasing energy needs in the world and our country, gives priority to renewable energy in energy production and sales. The target of our company, which concentrates its investments and researches in hydroelectric, solar, wind and geothermal fields, is to increase the total installed power to 100 MW in the short term.


Hydroelectric Power Plant (HEPP Projects)


Projects at the stage of operation

BAYBURT HEPP

YILDIRIM HEPP

Projects at the stage of Investment

Aydintepe HEPP

Pasinler HEPP


HEPP Projects – Projects at the stage of operation


BAYBURT HEPP

• 1 Şubat 2010 tarihinden itibaren üretime geçen Bayburt Hidroelektrik santralimiz ( HES ), 3×4,877 MWe, toplam 14,631 MWe kurulu gücündedir.

• The power plant on the Bayburt Province Coruh River has an estimated annual production capacity of 51,500,000 kWh.

YILDIRIM HEPP

• Yildirim Hydroelectric Power Plant (HEPP), which has been producing since September 29, 2012, has a total installed capacity of 10,677 MWe, 3×3,559 MWe.

• The power plant on the Bayburt Province Coruh River has an estimated annual production capacity of 33.300.000 kWh.


HEPP Projects – Projects at Investment Stage


• Preliminary License of Aydintepe HEPP Project has been taken on 02.12.2015 and works are continuing to receive its License. The project planned to be established in Bayburt Province will have 2×3,69 Mwe and 1×1,22 MWe, with a total installed power of 8.60 MWe. The estimated annual production is 23,020,000 kWh.

• The establishment of Pasinler HEPP Project in Erzurum is planned and it is at the Feasibility Evaluation stage. It is planned to be at 12 MWe installed power.


Solar Energy (GES Projects)


Projects at the stage of operation

KEMALPASA GES

Projects at the stage of Investment

TASGESIGHI GES

MANISA-TURGULT GES

GES Projects – Projects at the stage of operation

KEMALPASA GES

• Our Kemalpasa Solar Energy Plant (GES)operating since the date of March 29, 2017, has a total installed capacity of 2×0,75 MWp ,1.5 MWp.

• The power plant in Kemalpasa District of Izmir province has an estimated annual production capacity of 2,370,000 kWh.

GES Projects – Projects at Investment Stage

• Preliminary License of Taskesighi GES Project has been taken and works are continuing to receive its License. The project planned to be established in Korkuteli district of Antalya Province will have an installed power of 13.25 MW. The estimated annual production is 24,000,000 kWh.

• Manisa Turgutlu GES Project is planned to be established in the province of Turgutlu in Manisa Province and it is planned to have a total installed capacity of 2×1,091 MW and 1×0,877 MW, 3,059 MW by being regarded under the scope of Unlicensed Projects in line with the Regulation. The estimated annual production is 4,800,000 kWh.